Aoneng China Manufacturer Install Infrastructure DC Fast EV Electric Car Charging Station Charger Cost Solutions

Customization: Available
Connector Type: CCS2
Installation: Floor Type

Product Description

📋 Overview - Basic Info
Model NO.
ANDCE1-30KW/750V
Location
Public Use
Charging Interfaces
One Pile with One Charge
Start Mode
Credit Card, Mobile Remote, RFID
Input Power
3pH+N+PE(L1, L2, L3, N, PE)
Connector
CCS2*1
Rated Power
30kw
Certification
CE+CB
Package
Wooden Case
Specification
700*450*1900 mm
Origin
China
Capacity
2000PCS/Month
🚀 Product Description
⚙️ Product Parameters
Input Voltage 400 VAC ± 10% / 3 Phase + N + PE
Frequency 50/60 Hz
Power Factor ≥ 0.98
THDi ≤ 5%
Output Rate Power 30kW / 60kW
Voltage Range 200~1000VDC
Efficiency ≥ 96%
Cable Length 5m standard option
Interface Display 7 inch LCD Touch screen
Payment Credit Card, RFID card, Phone APP
Others Protection IP 54
Standards IEC 61851-1 / IEC 61851-23
Protocol DIN 70121
📜 Certifications & Case Show
❓ FAQ
Are you the factory or trading company?
We are factory with more than 20 years in the field of DC power supply solution, traction power supply and new energies. We warmly welcome you for the visit.
How is the delivery time?
Generally, the delivery time is between 7-30 days after getting payment. It depends on the specific products and quantity.
Do you have MOQ requirements?
MOQ is 1 PC. We have more than 100 technicians to fully meet customized requirements.
How long to fully charge a car?
Hours = Battery Capacity (kWh) / Power (Charger or OBC, whichever is lower). For example, a 40kWh battery with a 7kW OBC takes about 5.7 hours.
Can you provide customized service?
Yes. We have been involved with OEM and ODM projects since 2004, providing professional customized services.
Do you have after sales service?
Yes, we have an after-sales service team. Our engineers provide support and instructions via video or phone calls as needed.

Related Products